kaldin

  • Login

Chain Rule


1) 4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat-weavers in 8 days?
  • A)

  • B)

  • C)

  • D)

Next
Show Answer:
Show Answer


More Question
39 persons can repair a road in 12 days, working 5 hours a day. In how many days will 30 persons, working 6 hours a day, complete the work
A wheel that has 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions mad by the larger wheel is:
In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal
A man completes 5/8 of a job in 10 days. At this rate, how many more days will it takes him to finish the job
If the cost of x metres of wire is d rupees, then what is the cost (in rupees) of y metres of wire at the same rate