kaldin

  • Login

Chain Rule


1) An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth?
  • A)

  • B)

  • C)

  • D)

Next
Show Answer:
Show Answer


More Question
A wheel that has 6 cogs is meshed with a larger wheel of 14 cogs. When the smaller wheel has made 21 revolutions, then the number of revolutions mad by the larger wheel is:
36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work
A man completes 5/8 of a job in 10 days. At this rate, how many more days will it takes him to finish the job
Running at the same constant rate, 6 identical machines can produce a total of 270 bottles per minute. At this rate, how many bottles could 10 such machines produce in 4 minutes
In a dairy farm, 40 cows eat 40 bags of husk in 40 days. In how many days one cow will eat one bag of husk